
ServicesBathroom Remodeling
Bathroom Remodeling in North Richland Hills
We tear out worn showers, tubs and tile, fix what is hiding underneath, and rebuild on a waterproofed base. You get photos of the subfloor, plumbing and membrane before anything is covered, so you know what is behind your new walls.
What a bathroom remodel fixes, and when it is worth doing
Most bathrooms we open up are not failing on the surface. The trouble sits behind it: a shower pan that has wicked water into the framing for years, a toilet flange rusted loose, grout that cracked because the floor flexes. New tile over those problems only hides them for a while.
A remodel makes sense when the fixtures are dated and the substrate is suspect, or when you want a different layout, such as swapping a tub for a walk-in shower. If the bones are sound and you only want a fresh look, we will tell you that too, because a smaller job may be the right one.
Every stage gets photographed. When the old tile comes off, you see what we found. When the membrane goes on, you see it before the tile covers it.
The parts of a bathroom remodel we handle
- Tear-out to solid framing
- Old tile, backer board and damaged drywall come off until we reach dry studs and a firm subfloor. Before that starts, we lay floor protection and hang plastic dust walls between the bathroom and the rest of your home.
- Subfloor and framing repair
- Soft or stained plywood around a toilet or tub gets cut out and replaced. Rotted studs and plates are sistered or swapped so the new wall is flat and stiff enough for tile.
- Shower pan and waterproofing
- We build a sloped shower floor that drains to the drain, then apply a continuous waterproof membrane over cement board on the walls and pan. A flood test confirms the pan holds water before any tile goes down.
- Plumbing rough-in and valves
- Old valves are replaced with pressure-balancing valves that keep shower temperature steady when someone flushes. Supply lines, drains and the toilet flange are set to the new layout and checked for leaks.
- Tile, tub and fixture installation
- Floor and wall tile is set with the right mortar and trowel size for the tile format, with movement joints where the plane changes. Tubs, shower glass, toilets and faucets go in last.
- Ventilation
- An undersized or unducted exhaust fan is a common reason paint peels and grout mildews. We size the fan to the room and duct it to the outside, not into the attic.
Signs your bathroom needs more than a cleanup
A floor that gives near the toilet
A soft spot or a toilet that rocks usually means a failed wax ring has been leaking into the subfloor. The longer it runs, the more plywood has to come out.
Cracked grout that keeps coming back
Regrouting fixes it for a few months, then the cracks return. That points to movement in the substrate, not bad grout.
Stains on the ceiling below or the wall behind
Water marks on a ceiling under an upstairs bath, or swollen baseboard on the other side of a shower wall, mean water is escaping the shower or tub enclosure.
Loose tiles or hollow sounds
Tap a tile and hear a hollow note, and the bond has failed. Often water has reached the backer board behind it.
Shower temperature that jumps
Older two-handle or non-balancing valves let the shower go scalding or cold when water is used elsewhere. Replacing the valve means opening the wall, which is a good time to address the rest.
What moves the price of a bathroom remodel
Two bathrooms of the same size can cost very different amounts, mostly because of what is behind the walls and how much the layout changes. We price after seeing the room, and if demo turns up something the estimate did not cover, we show you before any added work begins.
Moving plumbing
Keeping the toilet, drain and shower in place costs far less than relocating them. Most homes here sit on concrete slabs, so moving a drain can mean cutting and patching the slab.
Condition of the subfloor and framing
Rot from a slow leak adds carpentry hours and material. We cannot price this exactly until the old floor is up, which is why we review it with you on site.
Tile size, pattern and amount
Large-format tile needs a flatter substrate, and small mosaics or patterned layouts take more labor per square foot. Floor-to-ceiling tile costs more than a wainscot height.
Shower type and glass
A custom tiled shower with a built pan and frameless glass is more work than a tub with a surround. Niches, benches and linear drains each add steps.
Permits and fixtures
Valve and electrical changes may need a permit and inspection. The fixtures you pick, from toilets to shower trim, also move the total.
How a bathroom remodel runs
- 1
Walkthrough and free quote
It starts in the room itself: we press on the floor around the toilet and tub, look at the valve and drain, and ask how you use the space day to day. The written estimate lists each part of the job on its own line.
- 2
Tear-out and the first look inside
Once demo is done, we photograph the framing, subfloor and supply lines and go over them with you. If something needs repair beyond the estimate, you see it and its price before we continue.
- 3
Rough-in, inspection and waterproofing
Plumbing and electrical changes are roughed in, and we pull the permit when the work requires one. The membrane and flood test are documented before tile, because no one will see them again.
- 4
Tile, fixtures and cleanup
Tile is set, grouted and sealed, then fixtures are installed and tested. We clean up daily and do a final walkthrough with you once everything is working.

Bathroom remodeling questions
How many weeks will we be without this bathroom?
Plan on a few weeks for a full remodel of one bathroom; the exact span depends on scope and when the inspector can come out. Relocating fixtures adds time. Your estimate comes with a schedule, and if demo uncovers something that shifts it, we tell you that day.
What happens if you find rot or a leak after demo?
We stop, photograph it and show you exactly what is damaged and why. You get the cost of the repair before we do it. Nothing extra is added without your okay.
Can you turn my tub into a walk-in shower?
Yes, this is one of the most common requests we get. It usually means moving or resizing the drain and building a new sloped pan, and on a slab that involves some concrete work. We will check the drain location during the walkthrough and explain what it takes.
Why does waterproofing matter if the tile looks fine?
Tile and grout are not waterproof. Water passes through grout and reaches the backer board, so the membrane behind the tile is what keeps the framing dry. That is why we flood test the pan and record the membrane before any tile goes on.
Do you remodel bathrooms as part of a larger project?
Yes. If you are also updating the kitchen or several rooms, our kitchen remodeling and whole home remodeling services can be scheduled together so trades and inspections line up.

See what is behind your bathroom walls
We will look at your bathroom, check the floor and plumbing, and give you a written estimate with the work broken out line by line. We work in North Richland Hills, Hurst, Keller, Bedford and nearby towns.